Rockwell-automation 281E ArmorStart EtherNet/IP - Getting Started Manuale Utente Pagina 35

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 44
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 34
Publication 280E-QS001B-EN-P – February 2011
ArmorStart EtherNet/IP Distributed Motor Controller Getting Started 35
Control Module Removal
1. Disconnect power by going to the control module and turning OFF the
At-Motor disconnect and performing lockout-tagout per your company
policy.
2. Remove motor cable.
3. Loosen the four mounting screws.
4. Unplug the Control module from the base by pulling forward.
Installation of Control Module
5. Install control module.
6. Tighten four mounting screws.
7. Install motor cable.
Figure 39 – Control Module Replacement
ATTENTION: To avoid shock hazard, disconnect main power before
working on the controller, motor, or control devices.
2
1
4
3
1
2
3
Motor Cable
30 lb•in./
3.39 N•m
Note: DeviceNet™ base module is shown.
Vedere la pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 43 44

Commenti su questo manuale

Nessun commento