FACTORYTALK SCHEDULER USERS GUIDE
96
• • • • •
would be the scheduling of a preventive maintenance activity or a breakdown, which only
applies to one resource. Global calendar exceptions are typically used for holidays or
factory shutdowns and are intended to affect the entire system. Both of these exceptions
can be added using the Exceptions Editor (see Appendix D).